Promoting science and technology education through spaceflight and weather balloons.

Artemis Cryogenic Test: Core Stage LH2 Underway; LOX Fill and Engine Bleed Test Complete

By |2022-09-21T12:24:00-04:00September 21st, 2022|Categories: NASA News|Tags: , , , , |

Fast fill continues for the Space Launch System (SLS) rocket’s core stage liquid hydrogen (LH2) tank at a reduced pressure as teams monitor the area where the hydrogen leak was detected. Fast fill is complete for the core stage liquid oxygen (LOX) tank and engineers have completed the engine bleed test, which flows supercold [...]

Hydrogen Leak Detected During Slow Fill Operations

By |2022-09-21T10:14:00-04:00September 21st, 2022|Categories: NASA News|Tags: , , , , |

Launch controllers have detected a hydrogen leak in a cavity in the tail service mast umbilical and have stopped flowing the propellant to the rocket while they troubleshoot the issue. Engineers will warm up the quick disconnect, or interface where the fuel feed line connects to the rocket, to attempt to reseat it. [...]

Artemis Cryogenic Test: Core Stage LOX Fast Fill Underway, Proceeding Toward LH2 Slow Fill

By |2022-09-21T09:13:00-04:00September 21st, 2022|Categories: NASA News|Tags: , , , , |

Fast fill is underway for the Space Launch System (SLS) rocket’s core stage liquid oxygen (LOX) tank. Next, teams will transition from slow fill to fast fill for the liquid hydrogen (LH2) tank and initiate, or “kick start,” the engine bleed, which will begin flowing supercold LH2 to start cooling the four RS-25 engines [...]

Core Stage Liquid Oxygen Chilldown Complete, Slow Fill Underway

By |2022-09-21T08:47:00-04:00September 21st, 2022|Categories: NASA News|Tags: , , , , |

After chilling the lines for liquid oxygen (LOX), teams have begun the slow fill phase to load LOX into the Space Launch System (SLS) rocket’s core stage and have started chilling down the transfer line for the liquid hydrogen (LH2). Once LOX slow fill is complete, teams will transition to fast fill operations. Once [...]

Launch Director Gives “Go” to Begin Cryogenic Operations, NASA TV Coverage Underway

By |2022-09-21T07:32:00-04:00September 21st, 2022|Categories: NASA News|Tags: , , , , |

Artemis Launch Director Charlie Blackwell-Thompson has given the “go” to officially begin loading propellants into the Space Launch System rocket as part of today’s Artemis I cryogenic demonstration test. Weather remains favorable for the test. Tanking operations will begin with chilldown of the core stage liquid oxygen transfer line. NASA TV coverage is underway. [...]

Preparations Continue, Key Milestones for Artemis I Demonstration Test 

By |2022-09-20T19:44:00-04:00September 20th, 2022|Categories: NASA News|Tags: , , , , |

As the countdown continued Tuesday toward the cryogenic demonstration test, teams conducted final closeouts at the pad and performed other preparations for the test. Work will continue through the night, and all non-essential personnel will leave Launch Pad 39B by 3:40 a.m. EDT Wednesday. The launch director is expected to give a “go” to [...]

Crew-5 Enters Quarantine for Mission to Space Station

By |2022-09-20T08:58:00-04:00September 20th, 2022|Categories: NASA News|Tags: , , , , , , |

From left, Roscosmos cosmonaut Anna Kikina, NASA astronauts Josh Cassada and Nicole Mann, and JAXA (Japan Aerospace Exploration Agency) astronaut Koichi Wakata will travel to the International Space Station on NASA’s SpaceX Crew-5 mission on Oct. 3, 2022. Photo credit: NASANASA astronauts Nicole Mann and Josh Cassada, along with JAXA (Japan Aerospace Exploration Agency) [...]

Go to Top